Termite Treatment

Termite Pest Control Treatment

Eliminate Existing Colonies and Prevent Future Infestations

Termite treatment methods are designed to eliminate active termite colonies and reduce the risk of future infestations. Depending on the condition of the property and the location of termite activity, treatment may involve termiticides, baiting systems, soil barriers or a combination of suitable termite-control methods.

Skill Termite Exterminator provides termite-control solutions for active infestations, completed properties, buildings under construction and long-term subterranean termite prevention.

  • Termite Baiting System
  • Post-Construction Treatment
  • Pre-Construction Treatment
  • Termguard Reticulation System
Termite Baiting System
Termite Baiting System Shared bait targets the entire termite colony, including the Queen and King.
Termite Baiting System

Long-Term Colony Elimination Through Shared Bait

Termite Baiting Systems use specially designed bait stations to control termite colonies. Worker termites consume the active bait and distribute it to other members of the colony, including the Queen and King.

As the bait spreads throughout the colony, termite activity gradually weakens until the colony collapses. Correct installation, monitoring and bait replenishment are important for effective treatment.

6–8 Approximate weeks are required for an Above-Ground Baiting System to eliminate a colony, depending on termite activity and bait consumption.
Baiting System Options

Baiting Systems for Different Termite Locations

The appropriate baiting system is selected according to where termite activity is detected and the surrounding building structure.

01
Above-Ground Termite Baiting System

Above-Ground Baiting System

Above-ground bait stations are installed directly over active termite trails found on walls, ceilings or furniture. Termites consume the bait and distribute it throughout the colony.

Approximately 6–8 Weeks
02
In-Ground Termite Bait Station

In-Ground Bait Stations

In-ground bait stations are installed in the soil around the property perimeter. Cellulose material attracts termites, and active bait is added after termite activity is detected.

Routine Monitoring
03
In-Concrete Termite Bait Station

In-Concrete Bait Stations

In-concrete bait stations are installed within concrete slabs or foundations to target termite activity in areas where conventional soil stations may not be suitable.

Concrete Installation
Post-Construction Corrective Termite Treatment
Drilling and Termiticide Injection Treatment creates a chemical barrier beneath the completed building.
Corrective Treatment

Post-Construction Corrective Treatment

This treatment is suitable for completed properties. Holes are drilled around perimeter ground beams and columns before termiticide is injected under pressure into the soil beneath the concrete slab.

The treatment creates a chemical barrier that helps repel subterranean termites entering through cracks, joints or imperfections in the building structure. After treatment, the holes are sealed using colour-matched cement.

1½ ft Hole Spacing
1½ ft Drilling Depth
5 L Termiticide Per Hole
Coring Corrective Termite Treatment
Tile Coring and Soil Treatment Original tiles are carefully removed and reinstalled after treatment.
Coring Corrective Treatment

Post-Construction Coring Treatment

Coring Corrective Treatment uses a core bit to carefully remove sections of existing tiles. This provides access to the soil beneath the concrete slab while preserving the original tiled surface.

Termiticide is injected into the drilled holes under pressure. After treatment, the original tiles are reinstalled and the treated areas are sealed neatly to minimise visible impact.

1½ ft Hole Spacing
1½ ft Drilling Depth
5 L Termiticide Per Hole
Pre-Construction Anti-Termite Soil Treatment
Preventive Soil Treatment Termiticide is applied before the building slab and structure are completed.
Preventive Termite Protection

Pre-Construction Anti-Termite Soil Treatment

Pre-construction anti-termite treatment applies termiticide directly to the soil before the building slab and structure are completed.

The treated soil forms a chemical barrier beneath the built-up area, helping protect the future property against subterranean termites entering through cracks, joints or structural gaps.

Early preventive treatment helps establish termite protection before an infestation develops within the completed structure.

Termguard Reticulation System
Termguard Reticulation System A refillable pipe network for long-term subterranean termite management.
Advanced Termite Prevention

Termguard Reticulation System

The Termguard Reticulation System uses a network of pipes installed beneath and around the building. The pipe system distributes termiticide directly into the surrounding soil to create a protective termite barrier.

The system supports precise, consistent and repeatable application without repeatedly drilling the completed property. It is designed for long-term subterranean termite prevention and management.

  • Installed beneath and around the building during construction.
  • Distributes termiticide directly into the surrounding soil.
  • Supports controlled and repeatable termiticide replenishment.
  • Designed for long-term subterranean termite protection.
50 Up to 50 years of effective and continuous subterranean termite protection.*

Protect Your Property from Termite Damage

Contact Skill Termite Exterminator for a professional assessment and a suitable termite treatment plan for your completed property, construction project or long-term termite prevention requirements.

Make Appointment

We would be more than happy to solve your problem and question, please arrange your appointment with us.

Skill Termite Exterminator provides professional termite control and pest management services across Malaysia for homes and businesses. Get safe, reliable solutions today!

 

© 2026 Skill Termite Exterminator Sdn Bhd 201001039131 (923055-V)

Visitor:

Powered by NEWPAGES